Other Voices: Getting the right mezzanine design


Editor’s Note: The following column by Max Puchtel, Senior Project Engineer, Wynright, is part of Modern’s new Other Voices column. The series, published on Wednesdays, will feature ideas, opinions and insights from end users, analysts, systems integraters and OEMs. Click on the link to learn about submitting a column for consideration.

***  ***  **
When a warehouse or distribution center outgrows its current facility, it faces a decision to build new or retrofit the existing facility. The smart use of existing vertical space, made possible by adding a structural solution such as a mezzanine, brings some considerations.

When DC managers decide to add an industrial steel structure to their warehouse or distribution center, a structural engineer is always faced with the fundamental design challenge of transmitting the structure’s loads to the building foundation. Let’s look at some of the primary considerations when adding structural solutions to a DC, the potential pitfalls of adding new loads onto existing foundations and which strategies can mitigate or hinder the risks associated with new structural design.

The challenge of the existing foundation

All structures traditionally accomplish the transmittal of the structure’s loads to the building foundation by utilizing isolated lateral frames. These frames are specific sections of the structure, located in strategic locations, which transmit lateral loads to the foundation and provide the overall structural stability. Although the loads on the foundation from these frames are relatively high, this approach is efficient when the structure is designed at the same time as the design of the building foundation. That way, the foundation can be designed to specifically handle the loads imposed by the isolated frames, such as by designing various types of accommodating footings.

However, within the material handling industry, this kind of coordinated construction is not always practical or possible. Often there are continual modifications and improvements which, over time, require the design of new structures that impose new loads well after the initial foundation has been designed and built. Evaluating the adequacy of existing foundations after the fact causes undesired consequences for the client. Sometimes costly new footings may be required, or the beneficial design features of the new structure, such as large column to column spacing and overall load capacity, have to be compromised.

General guidelines for the design process

In my experience, the design process requires a smart evaluation of all the elements mentioned above, but deciding how to treat the existing foundation is perhaps the biggest unknown factor in the design process. For example:  Are the depth, dimensions and quality of the concrete foundation known?  Does the client want to pay to test it?  Do the original design drawings or construction plans even exist? 

Because the quality of the foundation is commonly unknown, the foundation’s adequacy must be conservatively assumed. These assumptions inhibit the features of the new design; even making assumptions may cause additional problems. For example: Who is legally responsible for the foundation’s adequacy if it is not tested?  Will the engineer of record be comfortable with the assumptions?  Will the local building official accept those assumptions?  Will the seismic codes and requirements influence the acceptability of those assumptions?  How will your assumptions fare in areas where there have been past geotechnical issues?

Think differently about the solution

The above problems are always present, but their influence can be mitigated. There are two paths to choose from, each yielding different results:

The traditional route: Start with the straightforward approach of designing an isolated frame in the new structure. This process is well documented in structural engineering literature. The new large load reactions caused by that frame will need to be resisted by a new foundation design, which is based upon the testing of the existing soil and the slab, followed by an analysis and design of additional foundations. The installation of those footers will involve partial demolition of the existing slab and excavation of the earth below. Additional contractors will be required for the new concrete work, and each step of the process will significantly increase installation time.

The non-traditional route: Design the structure in a new way!  While many traditional approaches have been very successful in the retrofit of structural solutions to existing buildings, we have been successful in thinking more broadly about an approach. One example is: Rather than selecting isolated frames to transmit the lateral loads of the entire structure, each column itself can be thought of as a mini “frame” by designing it such that it is engaged in bending and, therefore, resists the lateral forces only tributary to itself. This strategy evenly distributes the lateral force reactions seen by the foundation throughout the entire structural footprint, greatly reducing the likelihood that additional footings or foundation modifications will be necessary at all and increasing the performance of the structure.

This approach has been well accepted in applications where the existing building is old, has unknown slab and soil conditions, or where the original structural plans are unavailable. Also, this strategy works very well in areas of high seismic activity, where the seismic loads must be dispersed as widely as possible and a high amount of redundancy in the structural system is preferred.

Your solutions

Every installation and design presents certain challenges. The best route for you will depend on many factors. By working closely with the design engineers, all of your requirements and your DC’s structural capabilities will be considered to yield the optimum design for you.

If the solution requires an unconventional design, you will need to engage engineers who understand it. Although intuitive, unconventional approaches are not clearly defined within structural engineering literature, especially in regard to special seismic codes and provisions. Not only will many structural engineers be unaware of this design strategy, but they also may not have the experience to get it built! 


Article Topics

Blogs
Ergonomics
Wynright
   All topics

Blogs News & Resources

Two voices of reason on pallet materials
60 Seconds with Bob Trebilcock, outgoing executive editor, Modern Materials Handling
Learn from lift truck service history
The reBound Podcast: How Pitney-Bowes is innovating with autonomous vehicles.
Packaging Corner: Be open to change
60 Seconds with Robert Martichenko of American Logistics Aid Network
The reBound Podcast: Looking for talent in all the right places: How Essendant is revolutionizing recruitment
More Blogs

Latest in Materials Handling

Beckhoff USA opens new office in Austin, Texas
Manhattan Associates selects TeamViewer as partner for warehouse vision picking
ASME Foundation wins grant for technical workforce development
The (Not So) Secret Weapons: How Key Cabinets and Asset Management Lockers Are Changing Supply Chain Operations
MODEX C-Suite Interview with Harold Vanasse: The perfect blend of automation and sustainability
Consultant and industry leader John M. Hill passes on at age 86
Registration open for Pack Expo International 2024
More Materials Handling

About the Author

Bob Trebilcock's avatar
Bob Trebilcock
Bob Trebilcock is the executive editor for Modern Materials Handling and an editorial advisor to Supply Chain Management Review. He has covered materials handling, technology, logistics, and supply chain topics for nearly 30 years. He is a graduate of Bowling Green State University. He lives in Chicago and can be reached at 603-852-8976.
Follow Modern Materials Handling on FaceBook

Subscribe to Materials Handling Magazine

Subscribe today!
Not a subscriber? Sign up today!
Subscribe today. It's FREE.
Find out what the world's most innovative companies are doing to improve productivity in their plants and distribution centers.
Start your FREE subscription today.

Latest Resources

Materials Handling Robotics: The new world of heterogeneous robotic integration
In this Special Digital Edition, the editorial staff of Modern curates the best robotics coverage over the past year to help track the evolution of this piping hot market.
Case study: Optimizing warehouse space, performance and sustainability
Optimize Parcel Packing to Reduce Costs
More resources

Latest Resources

2023 Automation Study: Usage & Implementation of Warehouse/DC Automation Solutions
2023 Automation Study: Usage & Implementation of Warehouse/DC Automation Solutions
This research was conducted by Peerless Research Group on behalf of Modern Materials Handling to assess usage and purchase intentions forautomation systems...
How Your Storage Practices Can Affect Your Pest Control Program
How Your Storage Practices Can Affect Your Pest Control Program
Discover how your storage practices could be affecting your pest control program and how to prevent pest infestations in your business. Join...

Warehousing Outlook 2023
Warehousing Outlook 2023
2023 is here, and so are new warehousing trends.
Extend the Life of Brownfield Warehouses
Extend the Life of Brownfield Warehouses
Today’s robotic and data-driven automation systems can minimize disruptions and improve the life and productivity of warehouse operations.
Power Supply in Overhead Cranes: Energy Chains vs. Festoons
Power Supply in Overhead Cranes: Energy Chains vs. Festoons
Download this white paper to learn more about how both systems compare.