Subscribe to our free, weekly email newsletter!


Filed in Productivity Solution

Saturday, August 01, 2015

Manufacturer transports materials with near-lights-out automatic guided vehicle system.

Cold storage facility saves $100,000 annually with LED lighting upgrade.

DC cuts lighting-related energy by 91% annually with new fixtures and software.

Wednesday, July 01, 2015

Popular online grocer cuts scrap rate, reduces IT burden with cloud-based warehouse management system.

Production uptime saves $1.5 million with browser-based enterprise labeling solution.

The system quickly configures requirements and blends orders for multiple clients in each building.

Monday, June 22, 2015

Workers no longer need flashlights to read technical drawings.

Monday, June 01, 2015

New system provides 92% floor space savings and 30% additional inventory capacity.

Apparel distributor adds 17,000 locations to increase storage capacity 86%.
Posted on 06/01 at 07:32 AM
FeaturesProductivity SolutionStorageJune 2015RetailProductivity SolutionSpeedcellPermalink


With room to grow, the new system is more efficient and secure.


Page 1 of 14 pages  1 2 3 >  Last ›
View all categories and topics


© Copyright 2015 Peerless Media LLC, a division of EH Publishing, Inc • 111 Speen Street, Ste 200, Framingham, MA 01701 USA