Subscribe to our free, weekly email newsletter!


Herman Miller wins RPA Excellence in Reusable Packaging Award

Company saved $46,000 by using reusables on one component.
By Modern Materials Handling Staff
October 30, 2012

Herman Miller Inc. is the winner of the Reusable Packaging Association’s first annual Excellence in Reusable Packaging Award. The winner was announced and the award was presented at PACK EXPO in Chicago. Herman Miller won the award for using reusable packaging for the shipping and handling of a component on a chair assembly line, saving the company $46,000 annually in material and labor.

“Herman Miller has been using returnable packaging throughout the company for more than 20 years as a step toward environmental sustainability,” said Cindy Doman, packaging engineer at Herman Miller. “As we understand better the positive financial impact it can also have on our manufacturing process, we are looking for other opportunities to use reusable packaging. We applaud the RPA for its work in educating companies about the positive impact that well-designed returnable packaging can have on people and profitability as well as the environment.”

“We were really pleased with the strength and number of entries for the award. And all the submissions will strengthen our growing library of best practices to help educate other companies,” said Mike Hachtman, RPA chairman of the board and president of ReLogistics. “We congratulate Herman Miller for winning the award, and for its innovative and beneficial use of reusable packaging.”

Herman Miller’s entry detailed the benefits gained when the company switched from expendable packaging to a returnable filler with crosslink foam for the shipping and handling of an office chair component. The part is a “Y” shaped plastic part called a “spine” that is assembled on its SAYL office chair.

The part was being shipped into Herman Miller Greenhouse in corrugated boxes that would be re-used several times before being recycled. By switching to the reusable solution, the company has gained the following measurable outcomes:
•    Saved 63 minutes per day in handling of the parts; this equates yearly to 266 hours
•    Using 4,300 fewer boxes saving 24,645 pounds of corrugated per year
•    Achieved a combined material and labor saving of $46,000
•    Eliminated the need for two warehouse skid locations
•    Eliminated movement of heavy boxes from skid to roller conveyor by a material handler, and eliminated need to cut them open with a knife
•    Eliminated handling of boxes by part supplier

“We always consider the role of returnable packaging in new product launches because we understand the benefits of using it,” said Doman. “This project alone eliminated 24,645 pounds of corrugated per year. It might not sound like a lot, but this is only one case study of one part.  There are hundreds of other case studies that would have similar results at Herman Miller. We will continue to be stewards of the environment for years to come.”

Subscribe to Modern Materials Handling magazine

Subscribe today. It's FREE!
Find out what the world’s most innovative companies are doing to improve productivity in their plants and distribution centers.
Start your FREE subscription today!

Recent Entries

Parent company's Logistics & Automation Division began servicing North American customers in 1962, 12 years before Murata machinery was established.

Pack Expo and Pharma Expo to draw 2,400 exhibitors in more than 1.2 million net square feet of exhibit space.

Cloud-based manufacturing execution systems grant visibility into centralized or global manufacturing environments.

In-plant trailers represent a tried and true method of moving materials through plants safely and efficiently. While trailers look alike at first glance, there are some significant differences that greatly affect performance and cost. The wise purchaser will study the differences and select the system that makes the best sense for the specific application. This complimentary white paper addresses the most important design factors to consider when specifying in-plant trailers.

Very often companies debate needing a new WMS or just muddling through while constantly adding to the List. The List is that set of notes that operations people wish their WMS could do. Every operation has their unique items, things their business requires that their WMS system doesn't do, or does poorly. This white paper reviews how to extend a WMS to allow the List to become a thing of the past.

About the Author

Josh Bond, Associate Editor
Josh Bond is an associate editor to Modern. Josh was formerly Modern’s lift truck columnist and contributing editor, has a degree in Journalism from Keene State College and has studied business management at Franklin Pierce. Contact Josh Bond


© Copyright 2013 Peerless Media LLC, a division of EH Publishing, Inc • 111 Speen Street, Ste 200, Framingham, MA 01701 USA