Page 1 of 2 pages.
NA 2010: A fresh start in Cleveland
March 1, 2010
If our recently completed 2010 State of the Materials Handling Industry report is any early indication, the show floor at NA 2010 should be rocking next month in Cleveland.
NA 2010: Turn 20,000 cardboard boxes into a 1 ton bundle
March 1, 2010
Continuous baler transforms 20,000 corrugated boxes into a single, compact bundle.
NA 2010: Lift large loads up to 18 feet
March 1, 2010
The BFL series of platform scissor lifts simultaneously move large items or multiple pallets from one floor to another floor.
NA 2010: Drawers provide secure, dust-free storage
March 1, 2010
AkroDrawers keep supplies and parts secure, dust-free and neatly organized.
NA 2010: Forks with rollers eliminate pallets
March 1, 2010
RollerForks lower handling costs by eliminating or reducing pallet use in favor of slipsheets cartons, intermediate bulk containers and corrugated bundles.
NA 2010: Enhanced supply chain software released
March 1, 2010
Supply Chain Advantage product suite offers improved implementation quality and speed, graphical business data, and customization.
NA 2010: Leveler lifts, transports, and positions 3,000 pound loads
March 1, 2010
The PalletPal mobile leveler allows workers to lift, transport and position loads up to 3,000 pounds on pallets or skids.
NA 2010: Automatic guided cart for automotive assembly lines
March 1, 2010
New automatic guided cart system of vehicles navigates around a fixed guide path of two complete loops while various seat models are assembled onboard the traveling cart.
NA 2010: Alert personnel about forklift/trailer status
March 1, 2010
The Rite-Vu light communication system alerts loading dock personnel to stay clear of dock openings while any trailer is in service for improved safety and productivity.
NA 2010: Secure shipments without void fill
March 1, 2010
The patent-pending, all-paper pack packaging system eliminates void fill, replacing it with a cohesive paper that secures the product in place within the package.
NA 2010: Kit adjusts pick window of automated storage system for flexibility
March 1, 2010
A pre- or post-installation pick window modification kit for the Shuttle vertical lift module helps companies quickly meet changing product characteristics.
NA 2010: Repair damaged rack without unloading product
March 1, 2010
Capable of fitting any manufacturer's rack system, a turnkey rack repair kit fixes damage to uprights and columns from forklifts and other materials handling equipment.
NA 2010: Semi-automated pallet storage
March 1, 2010
The semi-automated Pallet Runner Gen 3 high density storage system uses a heavy duty, four-wheel drive cart to transport pallets to and from the loading unloading position.
NA 2010: System coordinates order fulfillment
March 1, 2010
The Real Time Solutions order fulfillment system suite includes pick-to-light, pick-to-voice, pick-to-cart, RF picking and order fulfillment software.
NA 2010: Precise, intelligent overhead handling
March 1, 2010
The G-Jib incorporates the supplier's G-Force intelligent lifting device and an enclosed-track workstation jib crane to enhance precision throughout its full range of speed.